x
You are here:

Air Cushion Machine

Air cushion machines create cushions for use as filling empty spaces in packaging, perfect for quickly preventing products from impacts and scratches during transportation or storage. Reliable, practical and easy to use, it is going to offer a great difference of security for its containers, guaranteeing its delivery and satisfaction to its client.


Specifications

Features

Application

PRODUCT SPECIFICATIONS

Name:air cushion machine
Sealing speed:3m/min±10%(fix speed)
Air density control:adjustable(200/400mm in a differentsetting 
and operation range
Roll film size:200x80mm、200x100mm
200x150mm、200x150mm
400x250mm、400x290mm
Power voltage:220-240v  50hz
100-120v  60hz
Electrical rate:1450w
Machine size:455*215*215mm
Machine weight:3.6kg
MaterialABS

PRODUCT PICTURE






1.small size large function

2.thermostat design ,fan control

3.durable blade , replace easily

4.special design for preventing film running

5.taylor-made

Caution

Please read carefully before use.
1.Remove the machine from the package box carefully.
2.Put the machine in the clean and flat working table.
3.Ensure the air blower and air nozzle is no
jammed.
4.To avoid the dust run into the machine and air blower.

Installations Steps

1. Connect the correct electrical power. 

1. Connect the correct electrical power. 
2. Installation of film roll.

  2.1 The bubble film should be cut with a scissors in the lower
right corner before loading the film
  2.2 Put the roll film on the feeding roller properly. There is a groove
in the roll film.That should align to the feeding roller protruding part. 
  2.3 The roll feeding direction to pass through to the tension column.
  2.4 The roll film pass through to the tension column and open the roll film tensioner to un-lock position. And press to lock position when roll film is pass through to the tension roller properly. 
  2.5 Roller film pass through the nozzle guide post. 
  2.6 Pulling the roll film to close enough and touch just right between the hot sealing wheels to ensure when push start button the machine can pull out film till reach the front pulling wheels, and start making air cushion smoothly.

Operations

1.Connecting the electrical power, and press the power switch.

1.Connecting the electrical power, and press the power switch.
2.After power on the machine, the power indicator red light will go on and green light start to flashing, the machine is under heating processing (The warm up time around 4 mins).
3.When green light is solid on that mean machine is ready to making air cushion,
then press the start / pause button to start.
4.When finish making air cushion, press the start/pause button again, machine will stop immediately. There is a perforation line on the film to tear off the necessary length for your requirement.
5.Air density setting: Various cushion sizes are available to meet different
packaging requirements, You can use the pressing setting knob to set up the air density to meet you need. Please adjust the suitable air pressure to get best air cushion performance. Too much air pressure will result jam or bad air cushion performance (Remark: " A" area is suggest for 200mm width film and " B" area is suggest for 400mm width film). Refer fig. 10.
5.If continuous to using the machine, press the start/pause button when machine indicator is in solid on condition. Pause for more than 30 secs may cause film within hot rollers in a hot spot break. This is a normal condition as the hot roller always in a heating process.
6.If want to power off, please make sure power indicator is in solid on condition,tear off the film performation line ahead the air nozzle, and push start/pause button to eject the film completely, and push the start/pause button again to stop the machine, then you can turn off the power stwitch.

 

Caution: The machine need to warm up around 4 mins for every cold start.We suggest to installing the roll film right after you turn on the power switch.




Electric Safety

1. Place the machine close to power socket.
2.Make sure the voltage meets machine’s electricity requirements.
3.Any extension cord used should meet the power rating of the machine.
4.Do not operate if the power cord is damaged.
5.Repair and service should be done by a qualified service technician.

Cutter replacement

Air nozzle cutter blade replacement steps

Air nozzle cutter blade replacement steps
1.Use the screw driver to remove the fix air nozzle screws.
2.Pulling out the air nozzle. 
3.Remove the air nozzle fix screws. 
4.Renew the new cutter blade (Caution: Be care of sharp blade may cut you fingers).
5.Put the air nozzle back and use the screw driver to fix tightly of the 2 fix-screws.

 

Caution: Blade might blunt after a longer use, please check or replace the
blade every 50 rolls (300 m / roll).

Machine Maintenance

1.Unplug the power cord during maintenance.
2.Clean hot seals and rollers regularly. 
3.Ensure there is no jammed film and dirt at the air nozzle or cutter blade.
4.Clean the air nozzle regularly.
5.Renew the cutter blade when blade is not sharp.

LEAVE YOUR MESSAGES

If you have any questions about SureStar and SureStar products, please contact us.If you have any questions about SureStar and SureStar products, please contact us.

SEND MESSAGE